|
SECTION 9: BACKFILL
STEP 1: THE POOL SHOULD BE BACKFILLED TO A LEVEL ABOUT TWO FEET FROM THE
TOP OF THE WALL PANEL AS SOON AS THE CONCRETE HAS SET. THIS WILL PROTECT THE
FOUNDATION OF THE POOL AND PROVIDE A BASE TO LAY THE PLUMBING PIPES ON SO
THEY ARE NOT LAYING ON CONCRETE OR THE *A" FRAMES. THIS WILL ALSO PREVENT A
SAND WASHOUT IF A SUDDEN SHOWER OCCURS.
|