Picture

     TABLE OF CONTENTS

SECTION:

1. PLANNING

2. TOOLS AND MATERIALS

3. SITE LAYOUT

4. EXCAVATION

5. WALL ASSEMBLY

6. SUPPORTS

7. INSTALLING WALL FITTINGS

8. HOPPER GRADING

8A. AGGREGATE BOTTOM

8B. SAND BASE

9. BACKFILL

10. LINER INSTALLATION

11. FIBER OPTIC BULLNOSE INSTALLATION

12. FITTING FACE PLATES

13. FILTER AND PLUMBING

14. ELECTRICAL INSTALLATION

15. LADDER AND BOARD INSTALLATION

16. OPTIONAL POOL HEATER

17. OPTIONAL FIBERGLASS STEPS

18. OPTIONAL MAIN DRAIN

19. CONCRETE DECK PACKAGE (OPTIONAL)

20. OPTIONAL LADDER ANCHOR KIT

       SECTION 19: CONCRETE DECK PACKAGE (OPTIONAL)

 

   IF YOU PLAN TO POUR A CONCRETE DECK AT THE TIME OF INSTALLATION, IT IS

NECESSARY TO USE A CONCRETE DECK PACKAGE.  THIS INCLUDES STRUCTURAL

ANGLES AND HORIZONTALS THAT TIE INTO THE BOTTOM OF THE PANEL.  THIS

STRUCTURE WILL SUPPORT THE REE-BAR OR MESH USED IN THE DECK. (REE-BAR IS NOT

SUPPLIED WITH THE CONCRETE DECK PACKAGE.) THESE ARE INSTALLED AT THE SAME

TIME THE "A" FRAMES ARE INSTALLED. SEE FIGURE 3 lB.

 

   THE REE-BARS ARE INSTALLED AS SHOWN IN FIGURE 32. THE REE-BARS SHOULD BE

TIED TO THE HORIZONTALS AT ALL INTERSECTIONS.  IN SOME AREAS, IT MAY BE

DESIRABLE TO USE ADDITIONAL REE-BAR OR MESH. LET YOUR CONCRETE CONTRACTOR

ADVISE YOU, AS HE IS AWARE OF LOCAL CONDITIONS.

EMFIG31B
EMFIG33

[Home] [Service] [Products] [Order/ Inquiry]

Copyright ©1997-2007 Pools and Spas Online 800-245-4616