     TABLE OF CONTENTS

SECTION:

1. PLANNING

2. TOOLS AND MATERIALS

3. SITE LAYOUT

4. EXCAVATION

5. WALL ASSEMBLY

6. SUPPORTS

7. INSTALLING WALL FITTINGS

8. HOPPER GRADING

8A. AGGREGATE BOTTOM

8B. SAND BASE

9. BACKFILL

10. LINER INSTALLATION

11. FIBER OPTIC BULLNOSE INSTALLATION

12. FITTING FACE PLATES

13. FILTER AND PLUMBING

14. ELECTRICAL INSTALLATION

15. LADDER AND BOARD INSTALLATION

16. OPTIONAL POOL HEATER

17. OPTIONAL FIBERGLASS STEPS

18. OPTIONAL MAIN DRAIN

19. CONCRETE DECK PACKAGE (OPTIONAL)

20. OPTIONAL LADDER ANCHOR KIT

SECTION 8B: SAND BASE

 

STEP 1: TO PREPARE THE 2" SAND BED FOR THE POOL ALWAYS START IN THE HOPPER

AND WET THE SAND DOWN THOROUGHLY. THE SAND SHOULD BE TROWELED TO THE

TOP OF THE GUIDE BOARDS AND TO THE TOP OF THE HOPPER BOTTOM PATTERN USING A

MASON'S WOODEN FLOAT. THE SAND MUST BE KEPT MOIST, THEN TAMPED. THE SAND

SHOULD BE WET AND FLOATED AGAIN AND ADDITIONAL SAND ADDED WHERE

NECESSARY TO MAINTAIN THE 2" SAND BED. GUIDE BOARDS AND HOPPER FRAME ARE

REMOVED AND THE VOIDS FILLED WITH MOIST SAND.

 

   IN THE SHALLOW SECTION OF THE POOL, WET DOWN THE SAND UNTIL IT IS

SLIGHTLY DAMP ENABLING THE SAND TO BE PROPERLY TAMPED AND TROWELED.

SHOVEL THE SAND ACROSS THE BED. THEN USING A LONG 2" x 4" PIECE OF LUMBER,

LEVEL THE TOP OF THE BED. KEEP THE SAND MOIST AND TAMP THOROUGHLY TO FORM

A SOLID BED. THE BED SHOULD BE TROWELED SMOOTH AND LEVEL USING MORE SAND

IF NECESSARY.  WORK YOURSELF INTO A CORNER TO GET OUT OF THE POOL UPON

COMPLETION. DO NOT STEP ON THE COMPLETED SAND BED AS FOOTPRINTS WILL SHOW

THROUGH THE VINYL LINER

 